Bodkin BESS (27INR0611)

Bodkin BESS is a 79.1 MW other interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at The 138kV Danbury Dab DANBUR_POI_8 (BUS#42875) Station.

79.1 MWCapacity
OperationalStatus
BrazoriaMarket
OtherTechnology

Project facts

Canonical nameBodkin BESS
Queue ID27INR0611
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBrazoria
TechnologyOther
Capacity79.1 MW
StateTexas
CountyBrazoria
Point of interconnectionThe 138kV Danbury Dab DANBUR_POI_8 (BUS#42875) Station
Requested (queue) date2026-04-02
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperBodkin BESS, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.