Bonanza Station 34.5 kV bus (ASGI-2024-015)
Bonanza Station 34.5 kV bus is a 5.0 MW solar interconnection project in Bonanza, Arkansas with a current status of unknown. It is proposed to connect at Bonanza Station 34.5 kV bus.
5.0 MWCapacity
UnknownStatus
ARMarket
SolarTechnology
Project facts
| Canonical name | Bonanza Station 34.5 kV bus |
|---|---|
| Queue ID | ASGI-2024-015 |
| Status | unknown |
| Source status | None |
| Market | AR |
| Technology | Solar |
| Capacity | 5.0 MW |
| State | Arkansas |
| County | Bonanza |
| Point of interconnection | Bonanza Station 34.5 kV bus |
| Requested (queue) date | 2025-06-09 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AEP |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | unknown | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata