Border 345 kV interconnection substation (GEN-2021-014)

Border 345 kV interconnection substation is a 208.0 MW solar interconnection project in Beckham, Oklahoma with a current status of withdrawn. It is proposed to connect at Border 345 kV interconnection substation.

208.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameBorder 345 kV interconnection substation
Queue IDGEN-2021-014
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity208.0 MW
StateOklahoma
CountyBeckham
Point of interconnectionBorder 345 kV interconnection substation
Requested (queue) date2021-04-30
Proposed in-service date2029-12-31
Operational date
Withdrawn date2025-07-16
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata