The interXdata warehouse tracks 7 interconnection projects in Beckham, Oklahoma, representing 1,010 MW of requested capacity.

7Total projects
0Active
2Operational
5Withdrawn
1,010 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar3616 MW
Battery3293 MW
Wind1101 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Border 345 kV interconnection substationGEN-2021-010Solar208.0 MWwithdrawnBeckham, Oklahoma
Border 345 kV interconnection substationGEN-2021-014Solar208.0 MWwithdrawnBeckham, Oklahoma
Border 345 kV interconnection substationGEN-2021-012Battery203.0 MWwithdrawnBeckham, Oklahoma
Chisholm 345 kV SubstationGEN-2024-154Solar200.0 MWoperationalBeckham, Oklahoma
Sweetwater 230kVGEN-2006-002Wind100.8 MWoperationalBeckham, Oklahoma
Sweetwater 230kV substationGEN-2019-066Battery50.0 MWwithdrawnBeckham, Oklahoma
Erick 138kV SubstationGEN-2020-SR1Battery40.0 MWwithdrawnBeckham, Oklahoma

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Beckham County.

Start tracking with interXdata