Border Hybrid Energy Center (55510_CPP4)

Border Hybrid Energy Center is a 60.5 MW gas interconnection project in San Diego, California with a current status of operational.

60.5 MWCapacity
OperationalStatus
CISOMarket
GasTechnology

Project facts

Canonical nameBorder Hybrid Energy Center
Queue ID55510_CPP4
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyGas
Capacity60.5 MW
StateCalifornia
CountySan Diego
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2001-11-01
Withdrawn date—
Developer—
Utility / transmission ownerCalPeak Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.