Border Hybrid Energy Center (55510_HER)

Border Hybrid Energy Center is a 54.1 MW battery interconnection project in San Diego, California with a current status of operational.

54.1 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameBorder Hybrid Energy Center
Queue ID55510_HER
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyBattery
Capacity54.1 MW
StateCalifornia
CountySan Diego
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-11-01
Withdrawn date
Developer
Utility / transmission ownerCalPeak Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata