Border-Tuco 345kV Line (ERAS-2025-021)
Border-Tuco 345kV Line is a 500.0 MW wind interconnection project in Hale Center, Texas with a current status of operational. It is proposed to connect at Border-Tuco 345kV Line.
500.0 MWCapacity
OperationalStatus
TXMarket
WindTechnology
Project facts
| Canonical name | Border-Tuco 345kV Line |
|---|---|
| Queue ID | ERAS-2025-021 |
| Status | operational |
| Source status | ERAS |
| Market | TX |
| Technology | Wind |
| Capacity | 500.0 MW |
| State | Texas |
| County | Hale Center |
| Point of interconnection | Border-Tuco 345kV Line |
| Requested (queue) date | 2025-10-02 |
| Proposed in-service date | — |
| Operational date | 2030-06-14 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SPS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata