Bosque Upgrade (16INR0034)
Bosque Upgrade is a 124.0 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at Bosque Switch and 138kV Bosque Switch stations.
124.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology
Project facts
| Canonical name | Bosque Upgrade |
|---|---|
| Queue ID | 16INR0034 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Gas |
| Capacity | 124.0 MW |
| State | — |
| County | — |
| Point of interconnection | Bosque Switch and 138kV Bosque Switch stations |
| Requested (queue) date | 2014-02-06 |
| Proposed in-service date | 2019-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Calpine Energy Services, L.P. |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata