BOULDER OAKS HYBRID 2 (1804)
BOULDER OAKS HYBRID 2 is a 400.0 MW wind interconnection project in San Diego, California with a current status of withdrawn. It is proposed to connect at New Switchyard to loop the ECO-Miguel 500 kV Line.
400.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology
Project facts
| Canonical name | BOULDER OAKS HYBRID 2 |
|---|---|
| Queue ID | 1804 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | — |
| Technology | Wind |
| Capacity | 400.0 MW |
| State | California |
| County | San Diego |
| Point of interconnection | New Switchyard to loop the ECO-Miguel 500 kV Line |
| Requested (queue) date | 2020-04-15 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2021-03-10 |
| Developer | — |
| Utility / transmission owner | SDGE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata