Boundary (6433_54)

Boundary is a 180.5 MW other interconnection project in Pend Oreille, Washington with a current status of operational.

180.5 MWCapacity
OperationalStatus
SCLMarket
OtherTechnology

Project facts

Canonical nameBoundary
Queue ID6433_54
Statusoperational
Source status(OP) Operating
MarketSCL
TechnologyOther
Capacity180.5 MW
StateWashington
CountyPend Oreille
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1967-08-01
Withdrawn date
Developer
Utility / transmission ownerCity of Seattle - (WA)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata