Pend Oreille County, Washington — Interconnection Projects
The interXdata warehouse tracks 19 interconnection projects in Pend Oreille, Washington, representing 3,290 MW of requested capacity.
19Total projects
2Active
12Operational
5Withdrawn
3,290 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 19 | 3,290 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Ponderay Renewable Fiber and Blockchain Center Expansion | L0511 | Other | 600.0 MW | withdrawn | Pend Oreille, Washington |
| Boundary Substation | L0417 | Other | 370.0 MW | active | Pend Oreille, Washington |
| Ponderary Renewable Fiber and Blockchain Project | L0494 | Other | 300.0 MW | operational | Pend Oreille, Washington |
| Boundary | 6433_55 | Other | 239.4 MW | operational | Pend Oreille, Washington |
| Boundary | 6433_56 | Other | 239.4 MW | operational | Pend Oreille, Washington |
| 225 MW at Usk Substation | L0644 | Other | 225.0 MW | active | Pend Oreille, Washington |
| HiTest 2-Furnace Plant | L0429 | Other | 210.0 MW | withdrawn | Pend Oreille, Washington |
| Boundary | 6433_54 | Other | 180.5 MW | operational | Pend Oreille, Washington |
| Boundary | 6433_51 | Other | 180.5 MW | operational | Pend Oreille, Washington |
| Boundary | 6433_52 | Other | 161.5 MW | operational | Pend Oreille, Washington |
| Boundary | 6433_53 | Other | 158.4 MW | operational | Pend Oreille, Washington |
| HiTest 2-Furnace Plant | L0428 | Other | 105.0 MW | withdrawn | Pend Oreille, Washington |
| Arc Furnace Load | L0404 | Other | 90.0 MW | withdrawn | Pend Oreille, Washington |
| Boundary Powerhouse | G0507 | Other | 70.0 MW | operational | Pend Oreille, Washington |
| WA Queue Project G0496 — Other in Pend Oreille, Washington | G0496 | Other | 70.0 MW | withdrawn | Pend Oreille, Washington |
| Box Canyon | 3891_4 | Other | 22.5 MW | operational | Pend Oreille, Washington |
| Box Canyon | 3891_2 | Other | 22.5 MW | operational | Pend Oreille, Washington |
| Box Canyon | 3891_3 | Other | 22.5 MW | operational | Pend Oreille, Washington |
| Box Canyon | 3891_1 | Other | 22.5 MW | operational | Pend Oreille, Washington |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Pend Oreille County PUD No. 1 | 6 | 1,530 MW |
| The City of Seattle, City Light Department | 1 | 70 MW |
| Teck Metals, Ltd. | 1 | 370 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: bpa-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Pend Oreille County.
Start tracking with interXdata