Bountiful City is a 12.6 MW gas interconnection project in Davis, Utah with a current status of operational.

12.6 MWCapacity
OperationalStatus
PACEMarket
GasTechnology

Project facts

Canonical nameBountiful City
Queue ID3665_3A
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologyGas
Capacity12.6 MW
StateUtah
CountyDavis
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2012-06-01
Withdrawn date—
Developer—
Utility / transmission ownerCity of Bountiful - (UT)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.