BPP NY Somerset BESS I is a 200.0 MW battery interconnection project in Niagara, New York with a current status of withdrawn. It is proposed to connect at NYSEG KINTIGH 345 kV Station..

200.0 MWCapacity
WithdrawnStatus
AMarket
BatteryTechnology

Project facts

Canonical nameBPP NY Somerset BESS I
Queue ID1609
Statuswithdrawn
Source status0
MarketA
TechnologyBattery
Capacity200.0 MW
StateNew York
CountyNiagara
Point of interconnectionNYSEG KINTIGH 345 kV Station.
Requested (queue) date2023-09-22
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperBear Peak Power LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.