Bradwood Tap (L0229)

Bradwood Tap is a 40.0 MW other interconnection project in Clatsop, Oregon with a current status of withdrawn. It is proposed to connect at Allston -Astoria #1 115 kV Line near Cathlamet Tap.

40.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameBradwood Tap
Queue IDL0229
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity40.0 MW
StateOregon
CountyClatsop
Point of interconnectionAllston -Astoria #1 115 kV Line near Cathlamet Tap
Requested (queue) date2006-06-28
Proposed in-service date2008-01-01
Operational date
Withdrawn date
DeveloperPacifiCorp
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata