Bramble Energy Center (67767_BECBA)

Bramble Energy Center is a 225.1 MW battery interconnection project in Zavala, Texas with a current status of active.

225.1 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameBramble Energy Center
Queue ID67767_BECBA
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketERCO
TechnologyBattery
Capacity225.1 MW
StateTexas
CountyZavala
Point of interconnection—
Requested (queue) date—
Proposed in-service date2029-04-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerMission Clean Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata