Branch 161kV Substation (GEN-2017-231)

Branch 161kV Substation is a 72.5 MW solar interconnection project in Franklin County, Arkansas with a current status of active. It is proposed to connect at Branch 161kV Substation.

72.5 MWCapacity
ActiveStatus
ARMarket
SolarTechnology

Project facts

Canonical nameBranch 161kV Substation
Queue IDGEN-2017-231
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketAR
TechnologySolar
Capacity72.5 MW
StateArkansas
CountyFranklin County
Point of interconnectionBranch 161kV Substation
Requested (queue) date2017-11-28
Proposed in-service date2027-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata