Brandonville - Necessity 138 kV (AI1-211)

Brandonville - Necessity 138 kV is a 68.0 MW solar interconnection project in Preston, West Virginia with a current status of withdrawn.

68.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBrandonville - Necessity 138 kV
Queue IDAI1-211
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity68.0 MW
StateWest Virginia
CountyPreston
Point of interconnection
Requested (queue) date2022-09-10
Proposed in-service date2024-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.