Brazos Energy Center 2 (29INR0230)
Brazos Energy Center 2 is a 300.6 MW other interconnection project in McLennan, Texas with a current status of operational. It is proposed to connect at Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>.
300.6 MWCapacity
OperationalStatus
McLennanMarket
OtherTechnology
Project facts
| Canonical name | Brazos Energy Center 2 |
|---|---|
| Queue ID | 29INR0230 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | McLennan |
| Technology | Other |
| Capacity | 300.6 MW |
| State | Texas |
| County | McLennan |
| Point of interconnection | Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5> |
| Requested (queue) date | 2026-01-13 |
| Proposed in-service date | — |
| Operational date | 2029-09-18 |
| Withdrawn date | — |
| Developer | Ferrovial Energy US |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata