Brenneman Solar Project (66744_BRNMN)

Brenneman Solar Project is a 150.0 MW solar interconnection project in Macon, Georgia with a current status of active.

150.0 MWCapacity
ActiveStatus
SEPAMarket
SolarTechnology

Project facts

Canonical nameBrenneman Solar Project
Queue ID66744_BRNMN
Statusactive
Source status(T) Regulatory approvals received. Not under construction
MarketSEPA
TechnologySolar
Capacity150.0 MW
StateGeorgia
CountyMacon
Point of interconnection
Requested (queue) date
Proposed in-service date2026-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBrenneman Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata