Brentwood Energy Storage (C24-281)

Brentwood Energy Storage is a 49.1 MW battery interconnection project in Suffolk, New York with a current status of active. It is proposed to connect at Brentwood 69 kV Substation.

49.1 MWCapacity
ActiveStatus
KMarket
BatteryTechnology

Project facts

Canonical nameBrentwood Energy Storage
Queue IDC24-281
Statusactive
Source status6
MarketK
TechnologyBattery
Capacity49.1 MW
StateNew York
CountySuffolk
Point of interconnectionBrentwood 69 kV Substation
Requested (queue) date2024-09-25
Proposed in-service date
Operational date
Withdrawn date
DeveloperNew York Power Authority & LS Power Grid New York Corporation I
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.