BRESH HYBRID (C24-172)

BRESH HYBRID is a 59.2 MW solar+battery interconnection project in Ulster, New York with a current status of withdrawn. It is proposed to connect at BOULEVARD 69 kV SUBSTATION.

59.2 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameBRESH HYBRID
Queue IDC24-172
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity59.2 MW
StateNew York
CountyUlster
Point of interconnectionBOULEVARD 69 kV SUBSTATION
Requested (queue) date2024-09-17
Proposed in-service date
Operational date
Withdrawn date
DeveloperBLUE STONE RENEWABLE XXI LLC
Utility / transmission ownerCHGE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.