Brewster - Elk 161kV Line (J1300)

Brewster - Elk 161kV Line is a 120.0 MW solar interconnection project in Nobles County, Minnesota with a current status of withdrawn. It is proposed to connect at Brewster - Elk 161kV Line.

120.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBrewster - Elk 161kV Line
Queue IDJ1300
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity120.0 MW
StateMinnesota
CountyNobles County
Point of interconnectionBrewster - Elk 161kV Line
Requested (queue) date2019-04-29
Proposed in-service date2021-12-01
Operational date2021-12-01
Withdrawn date2021-03-24
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.