Bridgeport Energy Wet Compression Upgrade (530)

Bridgeport Energy Wet Compression Upgrade is a 18.0 MW gas interconnection project in Fairfield, Connecticut with a current status of withdrawn. It is proposed to connect at UI Singer Substation.

18.0 MWCapacity
WithdrawnStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameBridgeport Energy Wet Compression Upgrade
Queue ID530
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGas
Capacity18.0 MW
StateConnecticut
CountyFairfield
Point of interconnectionUI Singer Substation
Requested (queue) date2015-02-26
Proposed in-service date2018-06-01
Operational date
Withdrawn date2017-09-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata