Bridgeport Harbor #3 CNR Increase is a 5.0 MW gas interconnection project in Fairfield, Connecticut with a current status of operational. It is proposed to connect at UI Pequonnock 115 kV substation.
5.0 MWCapacity
OperationalStatus
SWCTMarket
GasTechnology
Project facts
| Canonical name | Bridgeport Harbor #3 CNR Increase |
|---|---|
| Queue ID | 365 |
| Status | operational |
| Source status | C |
| Market | SWCT |
| Technology | Gas |
| Capacity | 5.0 MW |
| State | Connecticut |
| County | Fairfield |
| Point of interconnection | UI Pequonnock 115 kV substation |
| Requested (queue) date | 2011-04-27 |
| Proposed in-service date | — |
| Operational date | 2011-10-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata