Bridgewater-Middlesex 230kV (U2-040)

Bridgewater-Middlesex 230kV is a 650.0 MW gas interconnection project in Middlesex, New Jersey with a current status of withdrawn.

650.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameBridgewater-Middlesex 230kV
Queue IDU2-040
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity650.0 MW
StateNew Jersey
CountyMiddlesex
Point of interconnection—
Requested (queue) date2008-06-12
Proposed in-service date2012-05-01
Operational date—
Withdrawn date2009-08-17
Developer—
Utility / transmission ownerPSEG Long Island

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata