Bright Stalk Generating Facility (AE2-223)
Bright Stalk Generating Facility is a 150.0 MW wind interconnection project in Mclean, Illinois with a current status of active. It is proposed to connect at McLean 345 kV.
150.0 MWCapacity
ActiveStatus
PJMMarket
WindTechnology
Project facts
| Canonical name | Bright Stalk Generating Facility |
|---|---|
| Queue ID | AE2-223 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Wind |
| Capacity | 150.0 MW |
| State | Illinois |
| County | Mclean |
| Point of interconnection | McLean 345 kV |
| Requested (queue) date | 2019-03-22 |
| Proposed in-service date | 2022-10-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Lexington Chenoa Wind Farm LLC |
| Utility / transmission owner | ComEd |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata