Bright Stalk Generating Facility (AE2-223)

Bright Stalk Generating Facility is a 150.0 MW wind interconnection project in Mclean, Illinois with a current status of active. It is proposed to connect at McLean 345 kV.

150.0 MWCapacity
ActiveStatus
PJMMarket
WindTechnology

Project facts

Canonical nameBright Stalk Generating Facility
Queue IDAE2-223
Statusactive
Source statusactive
MarketPJM
TechnologyWind
Capacity150.0 MW
StateIllinois
CountyMclean
Point of interconnectionMcLean 345 kV
Requested (queue) date2019-03-22
Proposed in-service date2022-10-31
Operational date
Withdrawn date
DeveloperLexington Chenoa Wind Farm LLC
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.