Bright Stalk Wind Farm I (57623_GEN1)

Bright Stalk Wind Farm I is a 205.2 MW wind interconnection project in McLean, Illinois with a current status of operational.

205.2 MWCapacity
OperationalStatus
PJMMarket
WindTechnology

Project facts

Canonical nameBright Stalk Wind Farm I
Queue ID57623_GEN1
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyWind
Capacity205.2 MW
StateIllinois
CountyMcLean
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2019-12-01
Withdrawn date—
Developer—
Utility / transmission ownerLexington Chenoa Wind Farm LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.