BRINKLEY EAST-AECC AUBREY 230kV (J2787)

BRINKLEY EAST-AECC AUBREY 230kV is a 200.0 MW solar interconnection project in Lee, Arkansas with a current status of withdrawn. It is proposed to connect at BRINKLEY EAST-AECC AUBREY 230kV.

200.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameBRINKLEY EAST-AECC AUBREY 230kV
Queue IDJ2787
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity200.0 MW
StateArkansas
CountyLee
Point of interconnectionBRINKLEY EAST-AECC AUBREY 230kV
Requested (queue) date2022-09-15
Proposed in-service date2025-06-30
Operational date2025-06-30
Withdrawn date2023-03-27
Developer—
Utility / transmission ownerENTERGY ARKANSAS, LLC EATO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata