Broadway Energy Storage (25-IC-AC)

Broadway Energy Storage is a 287.5 MW battery interconnection project in Jackson County, Georgia with a current status of operational.

287.5 MWCapacity
OperationalStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameBroadway Energy Storage
Queue ID25-IC-AC
Statusoperational
Source status—
MarketGA
TechnologyBattery
Capacity287.5 MW
StateGeorgia
CountyJackson County
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—operationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.