Broken Bow Wind II, LLC (58981_BBII)

Broken Bow Wind II, LLC is a 73.1 MW wind interconnection project in Custer, Nebraska with a current status of operational.

73.1 MWCapacity
OperationalStatus
SWPPMarket
WindTechnology

Project facts

Canonical nameBroken Bow Wind II, LLC
Queue ID58981_BBII
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyWind
Capacity73.1 MW
StateNebraska
CountyCuster
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2014-10-01
Withdrawn date
Developer
Utility / transmission ownerRWE Clean Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.