Bromley Battery Storage (67305_BROBA)

Bromley Battery Storage is a 11.8 MW battery interconnection project in Adams, Colorado with a current status of operational.

11.8 MWCapacity
OperationalStatus
WACMMarket
BatteryTechnology

Project facts

Canonical nameBromley Battery Storage
Queue ID67305_BROBA
Statusoperational
Source status(OP) Operating
MarketWACM
TechnologyBattery
Capacity11.8 MW
StateColorado
CountyAdams
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-06-01
Withdrawn date—
Developer—
Utility / transmission ownerBromley Energy Storage LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata