Bronc Rodeo Solar Project (25INR0440)
Bronc Rodeo Solar Project is a 105.7 MW solar interconnection project in Falls, Texas with a current status of operational. It is proposed to connect at Tap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385).
105.7 MWCapacity
OperationalStatus
FallsMarket
SolarTechnology
Project facts
| Canonical name | Bronc Rodeo Solar Project |
|---|---|
| Queue ID | 25INR0440 |
| Status | operational |
| Source status | SS Completed, FIS Completed, No IA |
| Market | Falls |
| Technology | Solar |
| Capacity | 105.7 MW |
| State | Texas |
| County | Falls |
| Point of interconnection | Tap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385) |
| Requested (queue) date | 2023-05-03 |
| Proposed in-service date | — |
| Operational date | 2028-09-18 |
| Withdrawn date | — |
| Developer | Energiekontor US Texas SP 16 LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata