Brownsville Peaking Power is a 118.0 MW gas interconnection project in Haywood, Tennessee with a current status of operational.

118.0 MWCapacity
OperationalStatus
TVAMarket
GasTechnology

Project facts

Canonical nameBrownsville Peaking Power
Queue ID55081_4
Statusoperational
Source status(OP) Operating
MarketTVA
TechnologyGas
Capacity118.0 MW
StateTennessee
CountyHaywood
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1999-06-01
Withdrawn date—
Developer—
Utility / transmission ownerTennessee Valley Authority

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.