BRP Charon BESS (23INR0360)

BRP Charon BESS is a 410.8 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Tap Smithers (#44650) and Bellaire (#47000) 345kV.

410.8 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameBRP Charon BESS
Queue ID23INR0360
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity410.8 MW
State
County
Point of interconnectionTap Smithers (#44650) and Bellaire (#47000) 345kV
Requested (queue) date2021-10-08
Proposed in-service date2027-12-01
Operational date
Withdrawn date
DeveloperBRP Charon BESS LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata