BRP Musca BESS (22INR0383)

BRP Musca BESS is a 100.5 MW other interconnection project in Reagan, Texas with a current status of operational. It is proposed to connect at 60361 Santa Rita 138kV.

100.5 MWCapacity
OperationalStatus
ReaganMarket
OtherTechnology

Project facts

Canonical nameBRP Musca BESS
Queue ID22INR0383
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketReagan
TechnologyOther
Capacity100.5 MW
StateTexas
CountyReagan
Point of interconnection60361 Santa Rita 138kV
Requested (queue) date2020-07-24
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperBRP Musca BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.