BRP Octans BESS is a 129.6 MW other interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at 6671 Tombstone 138kV.

129.6 MWCapacity
OperationalStatus
PecosMarket
OtherTechnology

Project facts

Canonical nameBRP Octans BESS
Queue ID22INR0386
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketPecos
TechnologyOther
Capacity129.6 MW
StateTexas
CountyPecos
Point of interconnection6671 Tombstone 138kV
Requested (queue) date2020-07-24
Proposed in-service date
Operational date2029-12-01
Withdrawn date
DeveloperBRP OCTANS BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.