Brushy Creek Solar SLF (20INR0213)

Brushy Creek Solar SLF is a 177.1 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at 6444 Red Creek 345kV.

177.1 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameBrushy Creek Solar SLF
Queue ID20INR0213
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity177.1 MW
State
County
Point of interconnection6444 Red Creek 345kV
Requested (queue) date2019-01-07
Proposed in-service date2028-06-01
Operational date
Withdrawn date
DeveloperBrushy Creek Solar LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.