Bryon Highway Power Bank (54788)

Bryon Highway Power Bank is a 662.3 MW gas+battery interconnection project with a current status of withdrawn. It is proposed to connect at TESLA 230 kV.

662.3 MWCapacity
WithdrawnStatus
CAISOMarket
Gas+BatteryTechnology

Project facts

Canonical nameBryon Highway Power Bank
Queue ID54788
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologyGas+Battery
Capacity662.3 MW
StateCalifornia
County
Point of interconnectionTESLA 230 kV
Requested (queue) date2023-04-17
Proposed in-service date2031-01-01
Operational date
Withdrawn date2024-12-02
Developer
Utility / transmission ownerPGAE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata