Budbreak Storage I (1596)

Budbreak Storage I is a 100.0 MW battery interconnection project in Yates, New York with a current status of withdrawn. It is proposed to connect at Greenidge to Montour 115kV Line.

100.0 MWCapacity
WithdrawnStatus
CMarket
BatteryTechnology

Project facts

Canonical nameBudbreak Storage I
Queue ID1596
Statuswithdrawn
Source status0
MarketC
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyYates
Point of interconnectionGreenidge to Montour 115kV Line
Requested (queue) date2023-08-23
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperBudbreak Storage, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.