Buffalo Gap Wind Farm (56240_1)

Buffalo Gap Wind Farm is a 120.6 MW wind interconnection project in Taylor, Texas with a current status of operational.

120.6 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameBuffalo Gap Wind Farm
Queue ID56240_1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity120.6 MW
StateTexas
CountyTaylor
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2006-04-01
Withdrawn date—
Developer—
Utility / transmission ownerAES Distributed Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata