Bulldog Power (TEF - Due Diligence) is a 311.0 MW gas interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at 39703 TNMP FM524 Substation 138kV.

311.0 MWCapacity
OperationalStatus
BrazoriaMarket
GasTechnology

Project facts

Canonical nameBulldog Power (TEF - Due Diligence)
Queue ID27INR0095
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketBrazoria
TechnologyGas
Capacity311.0 MW
StateTexas
CountyBrazoria
Point of interconnection39703 TNMP FM524 Substation 138kV
Requested (queue) date2023-11-14
Proposed in-service date—
Operational date2027-12-18
Withdrawn date—
DeveloperBulldog Power II LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.