Bureau County 138 kV (J1755)

Bureau County 138 kV is a 147.2 MW wind interconnection project in Bureau, Illinois with a current status of operational. It is proposed to connect at Bureau County 138 kV.

147.2 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameBureau County 138 kV
Queue IDJ1755
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity147.2 MW
StateIllinois
CountyBureau
Point of interconnectionBureau County 138 kV
Requested (queue) date2020-06-25
Proposed in-service date2022-08-01
Operational date2022-08-01
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata