Burgos Solar (25INR0214)

Burgos Solar is a 105.5 MW solar interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at 3701 Rookie Switch 138 kV.

105.5 MWCapacity
OperationalStatus
MilamMarket
SolarTechnology

Project facts

Canonical nameBurgos Solar
Queue ID25INR0214
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketMilam
TechnologySolar
Capacity105.5 MW
StateTexas
CountyMilam
Point of interconnection3701 Rookie Switch 138 kV
Requested (queue) date2022-10-18
Proposed in-service date
Operational date2027-11-22
Withdrawn date
DeveloperTwin Oaks Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.