Burgos Solar (25INR0214)
Burgos Solar is a 105.5 MW solar interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at 3701 Rookie Switch 138 kV.
105.5 MWCapacity
OperationalStatus
MilamMarket
SolarTechnology
Project facts
| Canonical name | Burgos Solar |
|---|---|
| Queue ID | 25INR0214 |
| Status | operational |
| Source status | SS Completed, FIS Completed, No IA |
| Market | Milam |
| Technology | Solar |
| Capacity | 105.5 MW |
| State | Texas |
| County | Milam |
| Point of interconnection | 3701 Rookie Switch 138 kV |
| Requested (queue) date | 2022-10-18 |
| Proposed in-service date | — |
| Operational date | 2027-11-22 |
| Withdrawn date | — |
| Developer | Twin Oaks Solar, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.