Burley Loads (L0553)
Burley Loads is a 5.2 MW other interconnection project in Teton, Idaho with a current status of operational. It is proposed to connect at West Burley-Heyburn No 1 138kV line.
5.2 MWCapacity
OperationalStatus
IDMarket
OtherTechnology
Project facts
| Canonical name | Burley Loads |
|---|---|
| Queue ID | L0553 |
| Status | operational |
| Source status | BPA COMPLETED |
| Market | ID |
| Technology | Other |
| Capacity | 5.2 MW |
| State | Idaho |
| County | Teton |
| Point of interconnection | West Burley-Heyburn No 1 138kV line |
| Requested (queue) date | 2023-03-28 |
| Proposed in-service date | — |
| Operational date | 2026-03-23 |
| Withdrawn date | — |
| Developer | City of Burley |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata