Teton County, Idaho — Interconnection Projects
The interXdata warehouse tracks 10 interconnection projects in Teton, Idaho, representing 39 MW of requested capacity.
10Total projects
1Active
8Operational
1Withdrawn
39 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 9 | 32 MW |
| Hydro | 1 | 7 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| New Midway Substation | L0581 | Other | 14.2 MW | active | Teton, Idaho |
| West Queue Project 1191 — Hydro in Teton, Idaho | 1191 | Hydro | 6.9 MW | withdrawn | Teton, Idaho |
| West Burley Loads | L0554 | Other | 5.2 MW | operational | Teton, Idaho |
| Burley Loads | L0553 | Other | 5.2 MW | operational | Teton, Idaho |
| Felt | 6359_1 | Other | 2.7 MW | operational | Teton, Idaho |
| Felt | 6359_2 | Other | 2.7 MW | operational | Teton, Idaho |
| Felt | 6359_5 | Other | 1.1 MW | operational | Teton, Idaho |
| Felt | 6359_4 | Other | 0.9 MW | operational | Teton, Idaho |
| Victor Transformer | L0279 | Other | 0.0 MW | operational | Teton, Idaho |
| Targhee Substation | L0256 | Other | 0.0 MW | operational | Teton, Idaho |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Fall River Rural Electric Cooperative, Inc. | 3 | 14 MW |
| City of Burley | 2 | 10 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: bpa-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Teton County.
Start tracking with interXdata