Burlington 138kV is a 336.0 MW gas interconnection project in Burlington, New Jersey with a current status of withdrawn.

336.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameBurlington 138kV
Queue IDB09b
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity336.0 MW
StateNew Jersey
CountyBurlington
Point of interconnection
Requested (queue) date1999-06-10
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPSEG Long Island

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.