Burlington 26 kV (AG1-130)

Burlington 26 kV is a 5.0 MW battery interconnection project in Burlington, New Jersey with a current status of active.

5.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameBurlington 26 kV
Queue IDAG1-130
Statusactive
Source statusEngineering and Procurement
Market
TechnologyBattery
Capacity5.0 MW
StateNew Jersey
CountyBurlington
Point of interconnection
Requested (queue) date2020-09-01
Proposed in-service date2027-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerPSEG Long Island

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata