Burnet Bay Storage (26INR0548)

Burnet Bay Storage is a 207.8 MW other interconnection project in Harris, Texas with a current status of operational. It is proposed to connect at tap 138kV 40390 Crosby - 40790 Haney.

207.8 MWCapacity
OperationalStatus
HarrisMarket
OtherTechnology

Project facts

Canonical nameBurnet Bay Storage
Queue ID26INR0548
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketHarris
TechnologyOther
Capacity207.8 MW
StateTexas
CountyHarris
Point of interconnectiontap 138kV 40390 Crosby - 40790 Haney
Requested (queue) date2024-09-10
Proposed in-service date
Operational date2029-06-01
Withdrawn date
DeveloperTOCE TX BESS 4, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata