Butcherbird Solar (25INR0337)

Butcherbird Solar is a 116.0 MW solar interconnection project in Bell, Texas with a current status of operational. It is proposed to connect at Tap 138 kV - Bell County #133 to Bartlett Switch #114.

116.0 MWCapacity
OperationalStatus
BellMarket
SolarTechnology

Project facts

Canonical nameButcherbird Solar
Queue ID25INR0337
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketBell
TechnologySolar
Capacity116.0 MW
StateTexas
CountyBell
Point of interconnectionTap 138 kV - Bell County #133 to Bartlett Switch #114
Requested (queue) date2023-12-18
Proposed in-service date
Operational date2029-01-31
Withdrawn date
DeveloperButcherbird Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata