Butterfly Meadows (AG1-411)
Butterfly Meadows is a 100.0 MW battery interconnection project in Van Wert, Ohio with a current status of active. It is proposed to connect at Maddox Creek-RP Mone 345 kV.
100.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology
Project facts
| Canonical name | Butterfly Meadows |
|---|---|
| Queue ID | AG1-411 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Battery |
| Capacity | 100.0 MW |
| State | Ohio |
| County | Van Wert |
| Point of interconnection | Maddox Creek-RP Mone 345 kV |
| Requested (queue) date | 2020-09-30 |
| Proposed in-service date | 2024-09-25 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Butterfly Meadows Solar Project, LLC |
| Utility / transmission owner | AEP |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata