Butterfly Meadows (AG1-411)

Butterfly Meadows is a 100.0 MW battery interconnection project in Van Wert, Ohio with a current status of active. It is proposed to connect at Maddox Creek-RP Mone 345 kV.

100.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology

Project facts

Canonical nameButterfly Meadows
Queue IDAG1-411
Statusactive
Source statusactive
MarketPJM
TechnologyBattery
Capacity100.0 MW
StateOhio
CountyVan Wert
Point of interconnectionMaddox Creek-RP Mone 345 kV
Requested (queue) date2020-09-30
Proposed in-service date2024-09-25
Operational date
Withdrawn date
DeveloperButterfly Meadows Solar Project, LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata